Urban MOT Setup for Utility Infrastructure Upgrade

Overview

ABC Roadworks managed all Maintenance of Traffic (MOT) operations for a multi-phase urban utility upgrade, ensuring safe vehicle and pedestrian movement throughout the project.
Talk to Our Team

Working in an active urban environment, this project required careful planning to maintain access for both vehicles and pedestrians. ABC Roadworks developed a phased MOT plan that adapted to each stage of construction, minimizing disruption to surrounding businesses and residents.  


Traffic patterns were adjusted daily based on work zones, with clear signage and barriers guiding drivers safely through the area. Pedestrian pathways were maintained and redirected as needed, ensuring full site accessibility while construction progressed.

Scope Of Work

  • MOT planning and implementation
  • Temporary traffic pattern design
  • Pedestrian rerouting
  • Daily traffic control adjustments
  • Signage and barricade placement

Contact Us

Contact Us